For Manager30 S2 systems being upgraded with RedVision®, the original BMS remote is no longer needed and the RBUS cable routing must be adjusted.
The existing remote cable can either be redirected from the 3-way RBUS connector to a port on the TVMS1280 Distribution Box, with the supplied RJ45 cable linking the box to the RedVision Pro Display, or the supplied RJ45 cable can connect the 3-way RBUS connector to the Distribution Box, while the existing cable links the box to the RedVision Pro Display.
REDARC recommends seeking the support of a qualified auto electrician or technician.
Important
For your safety, REDARC recommends installation by a qualified auto electrician or technician. Our trusted REDNetwork is made up of professional auto electrical businesses certified by REDARC to install the complete of REDARC solutions. Find Your Local Installer
This information is applicable to the following products:
- Manager30 S2 Battery Management System (BMS1230S2)
When expanding your existing Battery Management System to include RedVision®, the existing BMS1230S2 Remote is no longer required and a small difference to the RBUS Communication Cable routing is necessary.
The original RBUS connected to the BMS Remote will need to be re-used, through either of the following methods:
- You may redirect the existing remote cable from the 3-way RBUS connector to one of the RBUS ports on the TVMS1280-DB Distribution Box (not the Inverter port), and use the supplied 1m RJ45 cable to connect the TVMS1280-DB to the DISP4300 Display. This setup is outlined in the diagram below.
- Alternatively use the supplied 1m RJ45 cable - fitted in place of the existing remote cable at the 3-way RBUS connector – and connect the TVMS1280-DB Distribution Box to the 3-way RBUS connector. Then use the existing remote cable to join the Distribution Box to the DISP4300 Display.